0086-379-64087240
Engineering is the soul of construction. We can understand the employer's idea well and embody the requirements of the project construction function on the engineering documents (drawings). We will be familiar with the culture, customs and national (industry) standards and specifications of the project location. All kinds of drawings formed according to this design can pass various approval requirements smoothly.
We have set up a special supply department to divide the equipment of the CIC EPC project into two categories. One is our own equipment with manufacturing capacity. According to our company's process, we submit drawings to the company's subordinate factories to arrange the production. For the other part of the equipment that needs to be purchased, we integrate the resources of major suppliers around the world to ensure that all kinds of materials used in the design can meet the requirements of construction function, quality, cost control and construction progress.
In the stage of installation and construction, we should integrate the resources of civil engineering, use the advantages of civil engineering installation to realize the demand of design characteristics and creativity and reflect the demand of reducing cost, accelerating progress and ensuring quality. Ensure that all kinds of drawings formed in the design phase can be implemented smoothly. A special supervise team, led by the project manager, to be responsible for the whole process on site. The construction speed shall be comprehensively controlled, and the corresponding drawings required for construction shall be provided in a timely manner according to the requirements of construction progress, so as to realize the maximum possible overlap between design, procurement and construction, effectively reducing the construction period, and ensure the project investment to play its role as soon as possible.